Completed Jobs since 2017

design

Fire Engineering Services

  • RAAF Training Camp, Townsville, Fire Hydrant Upgrade, Design and Commissioning
  • Sami Bitumen Terminal Brisbane– Fire Foam Assessment
  • Hidden Valley Mine, PNG– Conveyor Fire Suppression Upgrade
  • Hyne Timber Mill– HV 11kv Transformer Upgrade
  • IOR Lytton Fuel Terminal Expansion– Fire Water & Foam System
  • IOR Lytton Fuel Terminal Expansion– QRA
  • Rex Hangar Sydney- Fire Foam System
  • Aquila Mine Overland Conveyor- Fire Water System Upgrade
  • United Petroleum Hasting Expansion- Fire Water & Foam System
  • Adelaide Airport– ARFFS Bulk Foam Storage Engineering and Design
  • Alice Spring Airport– ARFFS Bulk Foam Storage Engineering and Design
  • Coolangatta Airport– ARFFS Bulk Foam Storage Engineering and Design
  • Cairns Airport– ARFFS Bulk Foam Storage Engineering and Design
  • Ayers Rock Airport- ARFFS Bulk Foam Storage Engineering and Design
  • Mackay Airport- ARFFS Bulk Foam Storage Engineering and Design
  • Rockhampton Airport- ARFFS Bulk Foam Storage Engineering and Design
  • Launceston Airport- ARFFS Bulk Foam Storage Engineering and Design
  • Tugun By-Pass Tunnel– Fire Pump House Upgrade
  • Kirton Point Jetty, Port Lincoln SA, Fire Alarm Engineering and Design
  • St Helena Tunnel– TfNSW- Deluge Valves  Inspection
  • Fire Engineering Reports for various residential and commercial buildings, Brisbane
home-service-1

Turnkey Fire Jobs

  • Various Oil Terminals and mines– Supply Foam System Hardware – Ongoing
  • Fire Foam System Maintenance, Various Facilities, Qld- Ongoing
  • CQU Capricornia College, Fire Proofing Upgrade, Completed 2022
  • Wynnum Manly Yacht Club, Fire System Upgrade Including Under Water Fire Reticulation- Completed 2021
  • Emerald Training Facility, Fire Pumps Replacement Plus Fire Tank Repairment- Completed 2020
  • Various BP Oil Terminals In Australia, Supply Foam Concentrate
  • Proserpine Airport-  New ARFFS Foam System- Design, Supply, Installation, Commissioning & Certification- Completed 2020
  • Brisbane Airport New Runway-  ARFFS Foam System- Design, Supply, Installation, Commissioning & Certification- Completed 2020
  • St. Helena Tunnel, TfNSW, Repair Of Leaking Oil Seal Of Jacking Pump- Completed 2019
  • Tugun By-Pass, Lendlease, Deluge Valve (44 Valves) Inspection & (23 Valves) Replacement- Completed 2019
  • Tugun By-Pass, Lendlease, Pump House Upgrade, Design, Supply, Installation, Commissioning And Certification- Completed 2019
  • Tugun By-Pass TunnelLendlease, 5 Yearly Routine Service Of Fire Protection Systems And Equipment – Completed 2019
  • Salacia Waters, Firewater system– Design, procurement and installation of four flexible hoses to connect onshore piping- Completed 2018
pfass

PFAS Decontamination Services

  • Santos’ Moomba Plant– Fire Foam Replacement and PFAS Management- completed 2021

  • Santos’ Port Bonython Facility & Jetty- Fire Foam Replacement and PFAS Management- completed 2021

  • SL Kullaroo Tugboat, Completed 2021
  • SL Herbert Tugboat, Completed 2021
  • Berth 4, Adelaide, SA, Fire Foam Replacement and PFAS Management- Completed 2021
  • Kirton Point, Port Lincoln SA, Fire Foam Replacement and PFAS Management- Completed 2020

  • Berth 1, Port of Townsville, Fire Foam System Upgrade -Design, Supply, Installation, Commissioning and Certification- Completed 2020
  • Hexion, Melbourne, Fire Foam Replacement and PFAS Management, Completed 2018
  • Hexion, Brisbane, Fire Foam Replacement and PFAS Management, Completed 2018
  • M-Berth, Flinders Ports, Adelaide, Supply F3 foam, Cleaning Underground Foam Piping Network to Meet EPA and Adjust Foam System to Meet AS Requirements, Completed 2018
  • Toll Warehouse Logistics, Firefighting Foam Replacement For Two Bladder Tanks Plus Adjust Wide Range Ratio Proportioners To Meet DEHP And As Requirements, Completed 2017