Completed Jobs since 2017
Fire Engineering Services
- RAAF Training Camp, Townsville, Fire Hydrant Upgrade, Design and Commissioning
- Sami Bitumen Terminal Brisbane– Fire Foam Assessment
- Hidden Valley Mine, PNG– Conveyor Fire Suppression Upgrade
- Hyne Timber Mill– HV 11kv Transformer Upgrade
- IOR Lytton Fuel Terminal Expansion– Fire Water & Foam System
- IOR Lytton Fuel Terminal Expansion– QRA
- Rex Hangar Sydney- Fire Foam System
- Aquila Mine Overland Conveyor- Fire Water System Upgrade
- United Petroleum Hasting Expansion- Fire Water & Foam System
- Adelaide Airport– ARFFS Bulk Foam Storage Engineering and Design
- Alice Spring Airport– ARFFS Bulk Foam Storage Engineering and Design
- Coolangatta Airport– ARFFS Bulk Foam Storage Engineering and Design
- Cairns Airport– ARFFS Bulk Foam Storage Engineering and Design
- Ayers Rock Airport- ARFFS Bulk Foam Storage Engineering and Design
- Mackay Airport- ARFFS Bulk Foam Storage Engineering and Design
- Rockhampton Airport- ARFFS Bulk Foam Storage Engineering and Design
- Launceston Airport- ARFFS Bulk Foam Storage Engineering and Design
- Tugun By-Pass Tunnel– Fire Pump House Upgrade
- Kirton Point Jetty, Port Lincoln SA, Fire Alarm Engineering and Design
- St Helena Tunnel– TfNSW- Deluge Valves Inspection
- Fire Engineering Reports for various residential and commercial buildings, Brisbane
Turnkey Fire Jobs
- Various Oil Terminals and mines– Supply Foam System Hardware – Ongoing
- Fire Foam System Maintenance, Various Facilities, Qld- Ongoing
- CQU Capricornia College, Fire Proofing Upgrade, Completed 2022
- Wynnum Manly Yacht Club, Fire System Upgrade Including Under Water Fire Reticulation- Completed 2021
- Emerald Training Facility, Fire Pumps Replacement Plus Fire Tank Repairment- Completed 2020
- Various BP Oil Terminals In Australia, Supply Foam Concentrate
- Proserpine Airport- New ARFFS Foam System- Design, Supply, Installation, Commissioning & Certification- Completed 2020
- Brisbane Airport New Runway- ARFFS Foam System- Design, Supply, Installation, Commissioning & Certification- Completed 2020
- St. Helena Tunnel, TfNSW, Repair Of Leaking Oil Seal Of Jacking Pump- Completed 2019
- Tugun By-Pass, Lendlease, Deluge Valve (44 Valves) Inspection & (23 Valves) Replacement- Completed 2019
- Tugun By-Pass, Lendlease, Pump House Upgrade, Design, Supply, Installation, Commissioning And Certification- Completed 2019
- Tugun By-Pass Tunnel– Lendlease, 5 Yearly Routine Service Of Fire Protection Systems And Equipment – Completed 2019
- Salacia Waters, Firewater system– Design, procurement and installation of four flexible hoses to connect onshore piping- Completed 2018
PFAS Decontamination Services
Santos’ Moomba Plant– Fire Foam Replacement and PFAS Management- completed 2021
Santos’ Port Bonython Facility & Jetty- Fire Foam Replacement and PFAS Management- completed 2021
- SL Kullaroo Tugboat, Completed 2021
- SL Herbert Tugboat, Completed 2021
- Berth 4, Adelaide, SA, Fire Foam Replacement and PFAS Management- Completed 2021
Kirton Point, Port Lincoln SA, Fire Foam Replacement and PFAS Management- Completed 2020
- Berth 1, Port of Townsville, Fire Foam System Upgrade -Design, Supply, Installation, Commissioning and Certification- Completed 2020
- Hexion, Melbourne, Fire Foam Replacement and PFAS Management, Completed 2018
- Hexion, Brisbane, Fire Foam Replacement and PFAS Management, Completed 2018
- M-Berth, Flinders Ports, Adelaide, Supply F3 foam, Cleaning Underground Foam Piping Network to Meet EPA and Adjust Foam System to Meet AS Requirements, Completed 2018
- Toll Warehouse Logistics, Firefighting Foam Replacement For Two Bladder Tanks Plus Adjust Wide Range Ratio Proportioners To Meet DEHP And As Requirements, Completed 2017