Partners & clients
Some of the partners & clients
Other notable projects Fire Engineering Solutions have worked on include:
Projects under Fire Engineering Solutions QLD Pty Ltd
Providing Performance Solutions for various residential and commercial buildings, Brisbane
Fire Foam System Inspection and Maintenance Jobs for various facilities, QLD- Ongoing
United Petroleum Hasting Expansion– VIC- Ongoing
Various Airports in Australia, Air Services Australia, ARFFS Bulk Foam Storage Upgrade- Ongoing
Pinkenba and Cairns, UGL, Supply of Foam Concentrate- Ongoing
Berth 4 & Kirton Point, SA, Flindersports, Fire Foam Replacement and PFAS Management- Completed 2020
Hidden Valley Mine, PNG, Supply of Fire Engineering Services- Completed 2020
Proserpine Airport- New ARFFS Foam System- Design, Supply, Installation, Commissioning and Certification- ongoing
Brisbane Airport New Runway- ARFFS Foam System- Design, Supply, Installation, Commissioning and Certification- Completed 2020
Berth 1, Port of Townsville , Fire Foam System Upgrade -Design, Supply, Installation, Commissioning and Certification- Completed 2020
St. Helena Tunnel, RMS, Repair of Leaking Oil Seal of Jacking Pump- Completed 2019
St. Helena Tunnel, RMS, Deluge Valve (44 Units) Inspection- Completed 2019
Tugun By-Pass, Lendlease, Deluge Valve (44 Units) Inspection and replacement- Completed 2019
Tugun By-Pass, Lendlease, Pump house Upgrade, Design, Supply, Installation, Commissioning and Certification- Completed 2019
Tugun By-Pass Tunnel– Lendlease, 5 yearly Routine Service of Fire Protection Systems and Equipment – Completed 2019
Tugun By-Pass Tunnel- Lendlease, Tunnel Fire Proofing Inspection- Completed 2019
Bitumen Plant, SAMI Bitiment, Brisbane, Peer Review for Fire Foam Protection System, Completed 2018
RAAF Training Camp, Townsville, Fire Hydrant Upgrade, Design and Commissioning, Completed 2019
Chemical Plant, Melbourne, Fire Foam Replacement and PFAS Management, Completed 2018
Chemical Plant, Brisbane, Fire Foam Replacement and PFAS Management, Completed 2018
Kirton Point Jetty, Port Lincoln SA, , Fire Alarm Upgrade, Engineering and Design , Completed 2018
M-Berth, Flinders Ports, Adelaide, Supply F3 foam, Cleaning Underground Foam Piping Network to Meet EPA and Adjust Foam System to Meet AS Requirements, Completed 2018
Toll Warehouse Logistics, Firefighting Foam Replacement For Two Bladder Tanks Plus Adjust Wide Range Ratio Proportioners To Meet DEHP And As Requirements, Completed 2018
Salacia Waters, Firewater system– Design, procurement and installation of four flexible hoses to connect onshore piping, Completed 2018
Projects Completed Under Fire Engineering Solutions Pty Ltd
Santos’ Moomba Plant, Fire Foam Upgrade and PFAS Management- Completed
Santos’ Port Bonython facility and Jetty, Fire Foam Upgrade and PFAS Management- Completed
Lendlease, Tugun by-pass- Firefighting foam replacement and bladder cleaning to meet DEHP requirements, Completed 2017
Port of Brisbane, North Port foam replacement, Completed 2017
Port of Brisbane, Pinkenba AFFF foam Replacement with F3 foam to meet DEHP policy, Completed 2017
BP Refinery, Bulwer Island (with Jacobs) – Design of fire safety systems to convert refinery into to a jet fuel terminal – Completed 2016
United Petroleum, Melbourne – Design of fire safety systems for fuels terminal expansion – Completed 2016
NQBP, Port of Mackay – Design, supply of specialist equipment and commissioning of foam monitor fire protection system for bulk fuels Wharf 1 – Completed 2015
Flinders Ports, Adelaide (with SKM) – Design, supply, installation and commissioning of fire safety systems for bulk liquids Berth 4 – Completed 2014
AGL, Wallumbilla – Design, supply, installation and commissioning of fire safety systems upgrade at gas conditioning plant – Completed 2014
Rio Tinto, Kestrel – Design of fire water supplies for coal mine stock piles – Completed 2014
Aircraft Hangar, Brisbane International Airport – Design, supply, installation and commissioning of fire safety systems for a B-737 hangar – Completed 2013
Virgin Australia, Brisbane – Fire protection maintenance management for aircraft maintenance facility – 2010 to 2014
MMG, Sepon – Design to FMG approval of a performance based fire protection system for a copper solvent extraction plant (2013)
Shell Terminal, Brisbane – Performance testing and review of fire protection systems – completed 2012
Neumann Petroleum, Brisbane (with TFA) –Design, supply, installation and commissioning of fire safety systems for bulk liquids berth – Completed 2012
BP Terminal, Cairns – Review and testing of fire safety systems – Completed 2011
Sydney Ports Corporation (with Worley Parsons) – Design of fire safety systems for bulk liquids Berth 2 – Completed 2011
Rio Tinto Iron Ore, Dampier (with SKM) – Design of flammable liquids wharf (Completed 2011)
BP Refinery, Bulwer Island (with Delta Fire) – Review of crude and product wharves – Completed 2010
BP, WA – Review of fire protection at 4 terminals – Completed 2010
BP Terminal, Townsville – Review of fire protection – Completed 2010
BP, Whinstanes – Review of fire protection design – Completed 2010