About Project
A challenging but highly well-finished project by our team in 20 weeks!! The client was more than satisfied with the job, and so were we.
Complete upgrade of WMYC’s old fire water system to a new one. Fire Engineering Solutions completed the supply, installation and certification of the following scopes:
- 600m below-ground HDPE piping including earthmoving/disposal activites
- 400m underwater HDPE pipeworks,
- SS316 above-ground piping,
- New 44 hydrants and hose reels on the pontoons and inland
- Fire booster cabinet,
- Back Prevention Devices,