Wynnum Manly Yacht Club

About Project

A challenging but highly well-finished project by our team in 20 weeks!! The client was more than satisfied with the job, and so were we.
Complete upgrade of WMYC’s old fire water system to a new one. Fire Engineering Solutions completed the supply, installation and certification of the following scopes:

  • 600m below-ground HDPE piping including  earthmoving/disposal activites
  • 400m underwater HDPE pipeworks,
  • SS316 above-ground piping,
  • New 44 hydrants and hose reels on the pontoons and inland
  • Fire booster cabinet,
  • Back Prevention Devices,